About Tech Miles
Tech Miles has been in business since 2013, delivering technology projects for clients. The company's main offerings are Web Development. The company operates with a team of 10 - 49 professionals. Projects are generally billed around < $25 / hr/hr. Clients have rated Tech Miles 4.8 out of 5 in 5 reviews. This profile is a starting point — reach out to Tech Miles directly to discuss project specifics.
Where We Specialize
Industry Expertise
Typical Project Size
Tech Miles Reviews
Write a ReviewWeb3 architecture designed for the real world, not just for the pitch deck
Hyun-Su Lim / Director of Platform - Hanam Tech SolutionsMay 28, 2026
Project summary: The transition to EV had created demand for dealer network management capabilities our existing system was not designed to support. A targeted rebuild was the agreed path forward.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
The outcome we specified, delivered the way we needed it, by people we would hire again
Fatima Al-Suwaidi / Head of Digital Strategy - Gulf FinTech HoldingsFeb 18, 2026
Project summary: A merger had left us with two incompatible student information systems. We needed a consolidation path that preserved historical data, maintained service continuity, and met accreditation requirements.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
Cloud architecture that reduced our monthly infrastructure spend by over a third
Marcus Holloway / SVP of Engineering - Vertex Cloud DynamicsFeb 15, 2026
Project summary: Our internal product thinking was strong but our execution capability in this specific technology domain was limited. We needed depth, not generalism.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Analytics infrastructure that made our data science team genuinely productive for the first time
Liselotte Bakker / Head of Platform Engineering - Harbour Digital BVFeb 09, 2026
Project summary: Our mobile app had a 2.9-star average review score. The two themes in every negative review were speed and booking flow complexity — both were solvable with the right engineering partner.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
A technology investment that delivered returns ahead of the business case we approved
Jia Hui Tan / VP of Engineering - RedDot Technologies Pte LtdFeb 04, 2026
Project summary: Our actuarial models had outgrown the reporting infrastructure feeding them. Data latency was introducing risk into pricing decisions that the business had decided it could no longer accept.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Accessibility-first approach that broadened our audience and impressed our enterprise clients
Matthieu Renard / Directeur Technique - Lumière Technologies SASJan 21, 2026
Project summary: Our agents were spending more time managing data across disconnected systems than managing relationships. We needed a unified platform to give them that time back.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons