About Sidejar Studio
Sidejar Studio works with clients to plan, build, and ship digital products. Their core services include UI/UX Design. With 10 - 49 people on staff, Sidejar Studio can take on projects of varying size. Projects are generally billed around $50 - $99 / hr/hr. Sidejar Studio operates out of Silkeborg, Denmark. This gives a quick snapshot of what to expect when working with Sidejar Studio.
Where We Specialize
Industry Expertise
Typical Project Size
Sidejar Studio Reviews
Write a ReviewA DevOps engagement that delivered cultural change as well as technical change
Gustavo Ferreira / VP of Technology - Amazônia Digital LtdaJun 09, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Technology strategy that aligned our board, our CTO, and our engineering team for the first time
Cameron Aldrich / Head of Digital Operations - Northstar Logistics CorpJun 05, 2026
Project summary: Our actuarial models had outgrown the reporting infrastructure feeding them. Data latency was introducing risk into pricing decisions that the business had decided it could no longer accept.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
A partnership that began with a single project and earned a place on our preferred vendor list
Vikram Srinivasan / Head of Platform - Cascade EdTech SolutionsMar 10, 2026
Project summary: Lean manufacturing initiatives required real-time OEE data at the line level. Our existing systems could not provide it without significant manual aggregation.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Infrastructure-as-code that our SRE team treats as a reference example
Théo Beaumont / VP of Innovation - Laurentian Tech PartnersMar 07, 2026
Project summary: Lean manufacturing initiatives required real-time OEE data at the line level. Our existing systems could not provide it without significant manual aggregation.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Managed IT that made our internal teams forget infrastructure was something they once worried about
Ji-Woo Park / VP of Engineering - Seoul Digital CorpMar 05, 2026
Project summary: Unplanned downtime had become our single largest cost driver and our data showed that predictive maintenance could address the majority of it — if we had the right infrastructure to act on it.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
AR integration that increased session length by 35 percent within the first month
Eoghan Fitzgerald / VP of Engineering - Shannon Tech Solutions LtdFeb 10, 2026
Project summary: Our actuarial models had outgrown the reporting infrastructure feeding them. Data latency was introducing risk into pricing decisions that the business had decided it could no longer accept.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project