About Luna Design Agency
Luna Design Agency works with clients to plan, build, and ship digital products. Their core services include UI/UX Design and Web Development. Luna Design Agency works solo as a freelance specialist. Their home base is London, England. These details offer a useful starting point when evaluating Luna Design Agency.
Where We Specialize
Industry Expertise
Typical Project Size
Luna Design Agency Reviews
Write a ReviewPlatform engineering work that let our product teams move independently at last
Lars Pfeiffer / VP of Technology - NordTech Logistik GmbHApr 11, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Tokenisation project that went from whitepaper to mainnet without a single major incident
Eoghan Fitzgerald / VP of Engineering - Shannon Tech Solutions LtdMar 21, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Performance marketing that produced positive ROAS in the first full campaign cycle
Danielle Westbrook / Chief Digital Officer - BlueSky Retail HoldingsMar 21, 2026
Project summary: Rapid growth had created a skills gap on the platform engineering side of our business. We needed an experienced partner to close that gap while our internal team scaled, without compromising quality or timeline.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Implementation delivered with the discipline, documentation, and change management it required
Rupert Ashford / Director of eCommerce - Hargrove Retail PLCFeb 07, 2026
Project summary: A previous engagement had delivered something that worked in staging and struggled in production. We approached this project with greater rigour in vendor selection as a result.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
DevOps toolchain that compressed our two-week release cycle to same-day deployments
Omar Al-Farsi / Chief Technology Officer - Falcon Digital VenturesJan 28, 2026
Project summary: Digital service standards required all citizen-facing applications to meet accessibility and performance benchmarks that our inherited systems failed. Remediation was not viable — we needed a replacement.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously