About Larva Game Studios
Larva Game Studios has been in business since 2007, delivering technology projects for clients. The company's main offerings are AR/VR Development and Mobile App Development. Its team includes 10 - 49 specialists working across design, development, and delivery. Larva Game Studios operates out of Guadalajara, Mexico. This gives a quick snapshot of what to expect when working with Larva Game Studios.
Where We Specialize
Industry Expertise
Typical Project Size
Larva Game Studios Reviews
Write a ReviewMixed reality build that landed exactly where the brief pointed and then went further
Vikram Srinivasan / Head of Platform - Cascade EdTech SolutionsMay 03, 2026
Project summary: Our audience data was fragmented across eight tools with no single identity layer. Personalisation had become impossible without first solving the data foundation.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
A QA partner who treated our product quality as a personal responsibility
Radosław Kowalczyk / Head of Development - Wisła Software Sp zooMay 02, 2026
Project summary: A previous engagement had delivered something that worked in staging and struggled in production. We approached this project with greater rigour in vendor selection as a result.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Design system that brought consistency to a product that had accrued four years of visual debt
Dominic Fairfax / Head of Digital Transformation - Arcadian Consulting LtdApr 04, 2026
Project summary: Evolving open banking obligations required us to rebuild our API layer from the ground up. The architecture needed to be compliant by default, not bolted on after the fact.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
VR training that cut certification time and is genuinely preferred by our trainees
Cameron Aldrich / Head of Digital Operations - Northstar Logistics CorpApr 01, 2026
Project summary: Regulatory submission timelines required a document management platform that could handle version control, access permissions, and audit trails at a scale our existing tools were not designed for.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Consulting that delivered real options with real trade-offs rather than a predetermined answer
Jia Hui Tan / VP of Engineering - RedDot Technologies Pte LtdMar 02, 2026
Project summary: Track-and-trace capability had gone from a differentiator to a table-stakes requirement and our platform had neither. We needed to close the gap before our next enterprise tender cycle.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
A QA partner who treated our product quality as a personal responsibility
Eoghan Fitzgerald / VP of Engineering - Shannon Tech Solutions LtdFeb 05, 2026
Project summary: Our client portal had been built in 2017 and had not received meaningful investment since. Clients were contrasting it unfavourably with the portals of our competitors in pitches.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
ERP rollout that went live on the agreed date — we know how significant that is
Niamh O'Sullivan / Director of Product - Munster Digital LtdJan 26, 2026
Project summary: B2B customer churn was concentrated among accounts that had complained about portal usability. We needed a complete redesign of the self-service experience before the next contract renewal cycle.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Immersive experience that generated more media coverage than anything we had shipped before
Matthieu Renard / Directeur Technique - Lumière Technologies SASJan 09, 2026
Project summary: Matter management had become a significant overhead for our fee earners. Every hour spent on administration was an hour not spent on billable advisory work — the business case was straightforward.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously