About Jhuns Infobay
Jhuns Infobay is a software development company that turns ideas into working products. Their core services include Web Development and Branding & Graphic Design. With 10 - 49 people on staff, Jhuns Infobay can take on projects of varying size. Typical hourly rates run around $50 - $99 / hr/hr. These details offer a useful starting point when evaluating Jhuns Infobay.
Where We Specialize
Industry Expertise
Typical Project Size
Jhuns Infobay Reviews
Write a ReviewApp store launch with a four-point-eight average rating in the first month
Lars Pfeiffer / VP of Technology - NordTech Logistik GmbHMay 20, 2026
Project summary: B2B customer churn was concentrated among accounts that had complained about portal usability. We needed a complete redesign of the self-service experience before the next contract renewal cycle.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
A partnership that began with a single project and earned a place on our preferred vendor list
Reuben Loh / CTO - Marina Bay Ventures Pte LtdApr 26, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Performance-first web development that Google Core Vitals confirmed was the right approach
Shreya Krishnaswamy / VP of Product - Luminar Tech Pvt LtdApr 19, 2026
Project summary: B2B customer churn was concentrated among accounts that had complained about portal usability. We needed a complete redesign of the self-service experience before the next contract renewal cycle.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
CRM that finally unified our sales, marketing, and customer success teams in one system
Flynn Buchanan / GM of Technology - Pacific Rim Commerce GroupMar 30, 2026
Project summary: Digital-first buyer behaviour had made our property search experience a genuine competitive liability. We needed it to match the quality of the portfolio it was representing.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Immersive experience that generated more media coverage than anything we had shipped before
Dominic Fairfax / Head of Digital Transformation - Arcadian Consulting LtdMar 11, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
IT partner embedded deeply enough to understand our business, not just our ticket queue
Gustavo Ferreira / VP of Technology - Amazônia Digital LtdaJan 25, 2026
Project summary: A previous engagement had delivered something that worked in staging and struggled in production. We approached this project with greater rigour in vendor selection as a result.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
A DevOps engagement that delivered cultural change as well as technical change
Omar Al-Farsi / Chief Technology Officer - Falcon Digital VenturesJan 05, 2026
Project summary: Our internal product thinking was strong but our execution capability in this specific technology domain was limited. We needed depth, not generalism.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Mixed reality build that landed exactly where the brief pointed and then went further
Tobias Lindemann / Leiter Digitalisierung - Lindemann Industrie GmbHJan 04, 2026
Project summary: A previous engagement had delivered something that worked in staging and struggled in production. We approached this project with greater rigour in vendor selection as a result.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project