About iSolufy
iSolufy has been in business since 2012, delivering technology projects for clients. iSolufy focuses on UI/UX Design. With 10 - 49 people on staff, iSolufy can take on projects of varying size. Projects are generally billed around < $25 / hr/hr. These details offer a useful starting point when evaluating iSolufy.
Where We Specialize
Industry Expertise
Typical Project Size
iSolufy Reviews
Write a ReviewUser research that uncovered friction we had stopped noticing because it was always there
Aarav Mehta / Chief Data Officer - Zenith FinServ LtdJan 24, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
E-commerce build that united our digital and in-store inventory for the first time
Kelsey Drummond / Director of Digital Health - Crestline Health PartnersJan 20, 2026
Project summary: As a technology business ourselves we apply the same scrutiny to our vendor selection that our clients apply to us. We needed a delivery partner who could meet a standard we would be comfortable being measured against.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Content platform our editorial team adopted without a single escalated support request
Dominic Fairfax / Head of Digital Transformation - Arcadian Consulting LtdJan 18, 2026
Project summary: A merger had left us with two incompatible student information systems. We needed a consolidation path that preserved historical data, maintained service continuity, and met accreditation requirements.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Machine learning in production that the board could see working within eight weeks
Aoife Brennan / VP of Product Engineering - Emerald Digital LtdJan 17, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
Game launched with a four-point-seven store rating and no critical bugs in the first two weeks
Liselotte Bakker / Head of Platform Engineering - Harbour Digital BVJan 12, 2026
Project summary: Digital service standards required all citizen-facing applications to meet accessibility and performance benchmarks that our inherited systems failed. Remediation was not viable — we needed a replacement.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs