About Innovasoft Colombia
Innovasoft Colombia is a technology company. The company's main offerings are Mobile App Development and Custom Software Development. With 2 - 9 people on staff, Innovasoft Colombia can take on projects of varying size. Projects are generally billed around $100 - $149 / hr/hr. Innovasoft Colombia operates out of Bogotá, Colombia. This gives a quick snapshot of what to expect when working with Innovasoft Colombia.
Where We Specialize
Industry Expertise
Typical Project Size
Innovasoft Colombia Reviews
Write a ReviewHeadless CMS that finally allowed our designers and developers to work in parallel
Sebastian Lapointe / CTO - Boreal Systems IncJun 11, 2026
Project summary: Our actuarial models had outgrown the reporting infrastructure feeding them. Data latency was introducing risk into pricing decisions that the business had decided it could no longer accept.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Technically rigorous, commercially grounded, and a genuine pleasure to work with
Siobhan Gallagher / Chief Technology Officer - Northumbria FinTech LtdApr 29, 2026
Project summary: Our actuarial models had outgrown the reporting infrastructure feeding them. Data latency was introducing risk into pricing decisions that the business had decided it could no longer accept.
Our stakeholder group included board members, clinical leads, compliance officers, and end users — each with different technical literacy and different success criteria. This team navigated that stakeholder landscape as well as any vendor I have seen. They adjusted their communication register depending on the audience without losing the substance. They managed expectations honestly throughout. And they delivered a system that each group can point to as meeting their requirements. That breadth is genuinely uncommon.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Multiplayer infrastructure that held through a launch-day traffic spike we had not fully anticipated
Erik Lindqvist / Chief Technology Officer - Nordic Cloud ABApr 29, 2026
Project summary: The project had a board-facing delivery date tied to a strategic initiative. We needed a partner who would treat that date as their own, not ours.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
Technology strategy that aligned our board, our CTO, and our engineering team for the first time
Omar Al-Farsi / Chief Technology Officer - Falcon Digital VenturesApr 12, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
Penetration test that found things our previous vendor had missed for two consecutive years
Abdullah Al-Shehri / Head of Innovation - Desert Tech VenturesMar 11, 2026
Project summary: Track-and-trace capability had gone from a differentiator to a table-stakes requirement and our platform had neither. We needed to close the gap before our next enterprise tender cycle.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
An honest assessment of where we were, followed by a credible plan for where we needed to go
Imogen Tanner / Head of Engineering - Outback Data SolutionsFeb 27, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Virtual environment that our remote team now uses as their primary collaboration space
Shreya Krishnaswamy / VP of Product - Luminar Tech Pvt LtdFeb 12, 2026
Project summary: Our agents were spending more time managing data across disconnected systems than managing relationships. We needed a unified platform to give them that time back.
Our stakeholder group included board members, clinical leads, compliance officers, and end users — each with different technical literacy and different success criteria. This team navigated that stakeholder landscape as well as any vendor I have seen. They adjusted their communication register depending on the audience without losing the substance. They managed expectations honestly throughout. And they delivered a system that each group can point to as meeting their requirements. That breadth is genuinely uncommon.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Cloud architecture that reduced our monthly infrastructure spend by over a third
Niamh O'Sullivan / Director of Product - Munster Digital LtdJan 02, 2026
Project summary: Remote care had gone from an experiment to a core service line and our technology had not kept pace. We needed a robust, compliant telehealth platform in a timeline that the market would not wait for.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously