About Gecko-Lab
Since 2009, Gecko-Lab has operated as a technology services provider. Their core services include Mobile App Development and UI/UX Design, with experience serving clients in Nonprofit & NGO. Its team includes 10 - 49 specialists working across design, development, and delivery. Projects are generally billed around $25 - $49 / hr/hr. Clients have rated Gecko-Lab 5.0 out of 5 in 3 reviews. Their home base is Łódź, Poland. This gives a quick snapshot of what to expect when working with Gecko-Lab.
Where We Specialize
Industry Expertise
Typical Project Size
Gecko-Lab Reviews
Write a ReviewSales visibility we had been requesting for three years, delivered in fourteen weeks
Maja Söderström / Head of Product Engineering - Scandia Digital ABMay 31, 2026
Project summary: Rapid growth had created a skills gap on the platform engineering side of our business. We needed an experienced partner to close that gap while our internal team scaled, without compromising quality or timeline.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Tokenisation project that went from whitepaper to mainnet without a single major incident
Cameron Aldrich / Head of Digital Operations - Northstar Logistics CorpMay 14, 2026
Project summary: Dynamic pricing had been a manual process for years. We knew the revenue management opportunity was significant but lacked the technical capability to build the models and connect them to our booking engine.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Project execution that matched the proposal in every dimension that mattered
Bram de Vries / Chief Technology Officer - Windmill Tech BVApr 18, 2026
Project summary: The project had a board-facing delivery date tied to a strategic initiative. We needed a partner who would treat that date as their own, not ours.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
Multi-region setup that has delivered 99.97 percent uptime since go-live
Théo Beaumont / VP of Innovation - Laurentian Tech PartnersMar 30, 2026
Project summary: The transition to EV had created demand for dealer network management capabilities our existing system was not designed to support. A targeted rebuild was the agreed path forward.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Commerce platform that handled peak-day traffic at twelve times normal load without incident
Jia Hui Tan / VP of Engineering - RedDot Technologies Pte LtdMar 29, 2026
Project summary: The project had a board-facing delivery date tied to a strategic initiative. We needed a partner who would treat that date as their own, not ours.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
The kind of web build that makes you wonder why you tolerated the old site for so long
Yuki Hashimoto / Head of Product Development - East Asia Commerce KKMar 27, 2026
Project summary: The project had a board-facing delivery date tied to a strategic initiative. We needed a partner who would treat that date as their own, not ours.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Production system that has performed as specified since go-live without remediation work, documentation thorough enough to support internal maintenance, knowledge transfer that left our team genuinely capable
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism