About Emtwo
Emtwo works with clients to plan, build, and ship digital products. Their core services include Web Development and Mobile App Development. The company operates with a team of 2 - 9 professionals. Clients can expect pricing around $100 - $149/hr, with projects averaging about $40,000. This profile is a starting point — reach out to Emtwo directly to discuss project specifics.
Where We Specialize
Industry Expertise
Typical Project Size
Emtwo Reviews
Write a ReviewAnalytics infrastructure that made our data science team genuinely productive for the first time
Takashi Morimoto / Director of IT Strategy - Sakura Digital KKMay 12, 2026
Project summary: Our legacy LMS had been built for a classroom-first world. Hybrid delivery had exposed its limitations and student satisfaction scores had reflected that for two consecutive years.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
SEO work that moved our primary keywords from page two to position three in five months
Clémentine Aubert / Head of Digital Products - Arc-en-Ciel Digital SASApr 17, 2026
Project summary: A merger had left us with two incompatible student information systems. We needed a consolidation path that preserved historical data, maintained service continuity, and met accreditation requirements.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
AI models that replaced guesswork with evidence in decisions that matter most
Aarav Mehta / Chief Data Officer - Zenith FinServ LtdApr 07, 2026
Project summary: The project had a board-facing delivery date tied to a strategic initiative. We needed a partner who would treat that date as their own, not ours.
Our stakeholder group included board members, clinical leads, compliance officers, and end users — each with different technical literacy and different success criteria. This team navigated that stakeholder landscape as well as any vendor I have seen. They adjusted their communication register depending on the audience without losing the substance. They managed expectations honestly throughout. And they delivered a system that each group can point to as meeting their requirements. That breadth is genuinely uncommon.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Delivered on scope, on time, and with code quality that passed our strictest review
Flynn Buchanan / GM of Technology - Pacific Rim Commerce GroupMar 24, 2026
Project summary: Customer expectations had reset and our conversion funnel data showed precisely where we were losing them. We needed a commerce platform capable of delivering the experience our competitors already had.
Our stakeholder group included board members, clinical leads, compliance officers, and end users — each with different technical literacy and different success criteria. This team navigated that stakeholder landscape as well as any vendor I have seen. They adjusted their communication register depending on the audience without losing the substance. They managed expectations honestly throughout. And they delivered a system that each group can point to as meeting their requirements. That breadth is genuinely uncommon.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Cloud architecture that reduced our monthly infrastructure spend by over a third
Reuben Loh / CTO - Marina Bay Ventures Pte LtdMar 12, 2026
Project summary: Dynamic pricing had been a manual process for years. We knew the revenue management opportunity was significant but lacked the technical capability to build the models and connect them to our booking engine.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
Sales visibility we had been requesting for three years, delivered in fourteen weeks
Bram de Vries / Chief Technology Officer - Windmill Tech BVMar 03, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
Our stakeholder group included board members, clinical leads, compliance officers, and end users — each with different technical literacy and different success criteria. This team navigated that stakeholder landscape as well as any vendor I have seen. They adjusted their communication register depending on the audience without losing the substance. They managed expectations honestly throughout. And they delivered a system that each group can point to as meeting their requirements. That breadth is genuinely uncommon.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Cloud migration completed without the chaos our previous attempt had produced
Tobias Lindemann / Leiter Digitalisierung - Lindemann Industrie GmbHJan 26, 2026
Project summary: B2B customer churn was concentrated among accounts that had complained about portal usability. We needed a complete redesign of the self-service experience before the next contract renewal cycle.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
The first content management system we have deployed that editors genuinely prefer
Lars Pfeiffer / VP of Technology - NordTech Logistik GmbHJan 09, 2026
Project summary: Our internal product thinking was strong but our execution capability in this specific technology domain was limited. We needed depth, not generalism.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously