About Empeek
Empeek is a technology company founded in 2015. Empeek focuses on Mobile App Development for clients in industries such as Healthcare. Its team includes 50 - 249 specialists working across design, development, and delivery. Projects are generally billed around $25 - $49 / hr/hr. Empeek holds a 5.0-star rating across 20 client reviews. Overall, Empeek is one of the options worth shortlisting for a technology project.
Where We Specialize
Industry Expertise
Typical Project Size
Empeek Reviews
Write a ReviewComplete rebuild that our marketing team can now manage without engineering tickets
Takashi Morimoto / Director of IT Strategy - Sakura Digital KKJun 04, 2026
Project summary: Our actuarial models had outgrown the reporting infrastructure feeding them. Data latency was introducing risk into pricing decisions that the business had decided it could no longer accept.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Immersive experience that generated more media coverage than anything we had shipped before
Clémentine Aubert / Head of Digital Products - Arc-en-Ciel Digital SASMay 05, 2026
Project summary: Several years of incremental development had left us with a platform that was technically functional but strategically limiting. A structured rebuild was the agreed path forward.
We gave this team an aggressive timeline, a technically complex scope, and a client-side project team that was stretched thin and not always available at the speed the engagement required. They absorbed all of that gracefully. Where they needed input they were precise about what they needed and when. Where they could proceed independently they did. The result was a delivery that landed on time despite the constraints on our side, which I regard as evidence of genuine professional maturity.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
A technology investment that delivered returns ahead of the business case we approved
Elliot Thorne / Managing Director, Tech - Redwood Capital AdvisorsApr 09, 2026
Project summary: Grid modernisation funding required us to demonstrate demand-response capability. The machine learning models existed on paper; we needed an engineering partner to build and productionise them.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Commercially transparent throughout — no hidden assumptions, no bill shock at the end, change requests that were fair and clearly explained rather than used as a margin-recovery mechanism
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Roadmap that finally put our infrastructure investment in language the CFO could approve
Rupert Ashford / Director of eCommerce - Hargrove Retail PLCMar 20, 2026
Project summary: As a technology business ourselves we apply the same scrutiny to our vendor selection that our clients apply to us. We needed a delivery partner who could meet a standard we would be comfortable being measured against.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs
Questions & Answers
Checkout redesign that improved completed transaction rate from the first day in production
Niamh O'Sullivan / Director of Product - Munster Digital LtdFeb 26, 2026
Project summary: Lean manufacturing initiatives required real-time OEE data at the line level. Our existing systems could not provide it without significant manual aggregation.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
ERP rollout that went live on the agreed date — we know how significant that is
Yuki Hashimoto / Head of Product Development - East Asia Commerce KKFeb 06, 2026
Project summary: The project had a board-facing delivery date tied to a strategic initiative. We needed a partner who would treat that date as their own, not ours.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
Roadmap that finally put our infrastructure investment in language the CFO could approve
Abdullah Al-Shehri / Head of Innovation - Desert Tech VenturesJan 19, 2026
Project summary: A merger had left us with two incompatible student information systems. We needed a consolidation path that preserved historical data, maintained service continuity, and met accreditation requirements.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Infrastructure-as-code that our SRE team treats as a reference example
Eoghan Fitzgerald / VP of Engineering - Shannon Tech Solutions LtdJan 04, 2026
Project summary: Cross-agency data sharing had been blocked by incompatible systems for four years. A secure integration platform was the prerequisite for every transformation initiative in our roadmap.
Our stakeholder group included board members, clinical leads, compliance officers, and end users — each with different technical literacy and different success criteria. This team navigated that stakeholder landscape as well as any vendor I have seen. They adjusted their communication register depending on the audience without losing the substance. They managed expectations honestly throughout. And they delivered a system that each group can point to as meeting their requirements. That breadth is genuinely uncommon.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously