About Design and Test Lab
Design and Test Lab works with clients to plan, build, and ship digital products. The company's main offerings are Mobile App Development. With 10 - 49 people on staff, Design and Test Lab can take on projects of varying size. Typical hourly rates run around $25 - $49 / hr/hr. Clients have rated Design and Test Lab 4.9 out of 5 in 6 reviews. Their home base is Kharkiv, Ukraine. Overall, Design and Test Lab is one of the options worth shortlisting for a technology project.
Where We Specialize
Industry Expertise
Typical Project Size
Design and Test Lab Reviews
Write a ReviewEnd-to-end quality programme that halved our post-release incident rate inside three months
Kelsey Drummond / Director of Digital Health - Crestline Health PartnersMay 23, 2026
Project summary: Remote care had gone from an experiment to a core service line and our technology had not kept pace. We needed a robust, compliant telehealth platform in a timeline that the market would not wait for.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Purpose-built software that made our competitors' off-the-shelf tools look obsolete
Declan Hartley / Chief Digital Officer - Southern Cross TechnologyMay 16, 2026
Project summary: An international expansion required multi-currency, multi-language, and multi-warehouse capabilities that our existing platform could not support without a fundamental re-architecture.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
Single source of truth delivered — if you know how rare that is, you understand why we are impressed
Nathan Prescott / VP of Technology - Ironclad Insurance GroupMar 22, 2026
Project summary: Integration between our clinic management system and our patient-facing app had been a recurring failure point. We needed an engineering partner who could own the integration layer end to end.
The technical quality of the final deliverable is the easiest thing to point to. The automated test coverage is thorough, the deployment pipeline is reliable, the documentation is genuinely useful rather than ceremonially produced. But the metric I keep returning to is the number of post-launch conversations we have not had to have. No incident calls at two in the morning. No emergency patches. No retrospective discussions about what went wrong. The absence of those events is the evidence I would show to someone considering this vendor.
Delivery timeline that proved achievable rather than optimistic, estimation accuracy that reflected real analysis rather than competitive bidding, scope discipline that prevented the feature creep we had experienced before
Their insistence on a detailed functional specification before development began felt like friction at the time. In retrospect, it was the reason the development phase ran without the ambiguity that has derailed similar projects for us previously
Questions & Answers
Automation that freed our team from repetitive analysis and let them focus on strategy
Lars Pfeiffer / VP of Technology - NordTech Logistik GmbHMar 15, 2026
Project summary: The transition to EV had created demand for dealer network management capabilities our existing system was not designed to support. A targeted rebuild was the agreed path forward.
What made the most difference in practice was the quality of the engineering judgment on this team. Not the ability to execute a specification — that is a baseline expectation. The ability to recognise when a specification was suboptimal, explain why, propose an alternative, and support the client in making a decision about it. That consultative dimension elevated the output beyond what the brief described and resulted in a product that is more fit for purpose than the one we had originally specified.
Clear and consistent communication adapted appropriately for both technical and non-technical stakeholders, shared tooling that gave our team real-time visibility, reliable sprint delivery throughout
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
A technology investment that delivered returns ahead of the business case we approved
Bilal Chaudhry / Co-Founder & CTO - Indus Software HouseMar 07, 2026
Project summary: Matter management had become a significant overhead for our fee earners. Every hour spent on administration was an hour not spent on billable advisory work — the business case was straightforward.
Six months after go-live our platform is processing three times the transaction volume we specified in the original brief. The architecture choices made during discovery accommodated that growth without remediation work. That is the difference between a team that designs for what you tell them and a team that designs for what you are likely to need. We are in conversation about a Phase 2 engagement and I expect to be using this partnership for several years.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
Analytics infrastructure that made our data science team genuinely productive for the first time
Fatima Al-Suwaidi / Head of Digital Strategy - Gulf FinTech HoldingsFeb 23, 2026
Project summary: The project had a board-facing delivery date tied to a strategic initiative. We needed a partner who would treat that date as their own, not ours.
The thing that retrospectively seems most significant is how little drama there was. Complex technology projects tend to accumulate incidents, escalations, and tense conversations. This one did not. Problems were surfaced before they became incidents. Scope changes were handled with process rather than conflict. Risks were managed rather than avoided. That level of maturity is rare in my experience and it made the delivery feel almost effortless from our side, which I know it was not from theirs.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs