About Base Blocks tech
Base Blocks tech is a software development company that turns ideas into working products. Base Blocks tech focuses on Cloud Services. Base Blocks tech employs 10 - 49 people. Projects are generally billed around $25 - $49 / hr/hr. Clients have rated Base Blocks tech 5.0 out of 5 in 4 reviews. The team is based in Kyiv, Ukraine. This profile is a starting point — reach out to Base Blocks tech directly to discuss project specifics.
Where We Specialize
Industry Expertise
Typical Project Size
Base Blocks tech Reviews
Write a ReviewCustom pipeline configuration that maps exactly to how our team actually sells
Siobhan Gallagher / Chief Technology Officer - Northumbria FinTech LtdJun 05, 2026
Project summary: A previous engagement had delivered something that worked in staging and struggled in production. We approached this project with greater rigour in vendor selection as a result.
We had worked with three agencies before this engagement. The comparison is not flattering to the others. What distinguished this team was a systematic approach to understanding the problem before proposing a solution — something that sounds obvious and is practiced far less often than it should be. The delivery phase ran to schedule, the codebase is clean enough that our internal engineers made positive comments during handover review, and we have not logged a critical incident in five months of live operation. We intend to use them for our next phase of work.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Blockchain expertise that came with clear explanations, not just technical jargon
Hyun-Su Lim / Director of Platform - Hanam Tech SolutionsMay 23, 2026
Project summary: Unplanned downtime had become our single largest cost driver and our data showed that predictive maintenance could address the majority of it — if we had the right infrastructure to act on it.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
The quality of documentation they produce means our team needed to set aside dedicated review time to do it justice — a minor scheduling point rather than a genuine criticism
Questions & Answers
Publishing workflow that took our time-to-live from days to under an hour
Lars Pfeiffer / VP of Technology - NordTech Logistik GmbHApr 23, 2026
Project summary: Our legacy LMS had been built for a classroom-first world. Hybrid delivery had exposed its limitations and student satisfaction scores had reflected that for two consecutive years.
I came into this engagement as a sceptic. We had been through a failed implementation with a previous vendor and I had high standards for what evidence of competence looked like before I would trust a partner with our core systems. This team earned that trust progressively — through the quality of the discovery documentation, the rigour of the technical proposals, the consistency of the sprint deliveries, and ultimately the stability of the production system. I no longer lead with scepticism when recommending them.
Collaborative culture that made the team feel like a genuine extension of our organisation, strong asynchronous communication across time zones, zero-drama handling of the inevitable mid-project changes
Time zone coordination required some deliberate overlap management from both sides in the first couple of sprints, after which we had an efficient async rhythm that worked for the whole project
Questions & Answers
The outcome we specified, delivered the way we needed it, by people we would hire again
Matthieu Renard / Directeur Technique - Lumière Technologies SASMar 02, 2026
Project summary: Our trading platform had been extended incrementally for seven years. Latency was degrading, technical debt was compounding, and a clean rebuild was no longer optional.
We had worked with three agencies before this engagement. The comparison is not flattering to the others. What distinguished this team was a systematic approach to understanding the problem before proposing a solution — something that sounds obvious and is practiced far less often than it should be. The delivery phase ran to schedule, the codebase is clean enough that our internal engineers made positive comments during handover review, and we have not logged a critical incident in five months of live operation. We intend to use them for our next phase of work.
Deep domain knowledge that reduced the discovery overhead significantly, proactive risk identification before issues became incidents, delivery cadence that our stakeholders found reassuring
Pipeline availability for kickoff required a few weeks of lead time — in hindsight that selection pressure means you are working with a team that is in demand for the right reasons
Questions & Answers
AI models that replaced guesswork with evidence in decisions that matter most
Beatriz Cavalcanti / Chief Digital Officer - Cerrado Tech SAFeb 26, 2026
Project summary: Our actuarial models had outgrown the reporting infrastructure feeding them. Data latency was introducing risk into pricing decisions that the business had decided it could no longer accept.
The integration layer was the part of the project I was most concerned about going in. Our system landscape is complex, several of the upstream APIs we relied on were poorly documented, and two third-party vendors had a history of unpredictable response times on integration questions. This team managed all of that. They documented what the upstream vendors could not, built resilience into the integration architecture where the upstream behaviour was unreliable, and delivered a solution that works as specified in production. I could not have asked for more.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
Their discovery process is more rigorous than we were accustomed to and required more preparation from our side than we had initially allocated — but the quality of what followed justified every hour of it
Questions & Answers
AR integration that increased session length by 35 percent within the first month
Sebastian Lapointe / CTO - Boreal Systems IncJan 25, 2026
Project summary: Our client portal had been built in 2017 and had not received meaningful investment since. Clients were contrasting it unfavourably with the portals of our competitors in pitches.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Senior-level engineering presence throughout the entire project, not just during the pitch, honest and commercially fair handling of scope changes, codebase that our internal team praised on review
The engagement was priced at the quality level rather than the budget level. We evaluated the alternatives and concluded that the delta was a reasonable premium for the reduction in delivery risk
Questions & Answers
Custom pipeline configuration that maps exactly to how our team actually sells
Shreya Krishnaswamy / VP of Product - Luminar Tech Pvt LtdJan 23, 2026
Project summary: Our engineering capacity was committed to maintaining existing systems and could not absorb a net-new build of this complexity. An external partner with the right skills was the only viable option.
The project brief was ambitious and we had received proposals ranging from two to five times our eventual budget from other vendors. This team came back with a proposal that was commercially realistic and technically credible — and then delivered against it. That alignment between proposal and outcome is not something I take for granted. I have been on the other side of it enough times to know it requires both honesty in the sales process and discipline in delivery. We experienced both.
Architectural decisions designed for longevity rather than just the current brief, thorough automated test coverage, post-launch stability that validated every technical choice made during discovery
We underestimated the input required from our subject matter experts during the requirements phase. The team flagged this early but our resource planning did not fully reflect it — our responsibility, not theirs